Seasonal Buying Calendar: When to Place Orders with Turkish Factories

Turkish factories operate two main seasonal cycles: spring/summer (sample Sep-Nov, bulk Jan-Apr, ship Mar-Jun) and autumn/winter (sample Mar-May, bulk Jul-Oct, ship Sep-Dec). Capacity tightens 4-6 wee

planningstrategy
TL;DR

Turkish factories operate two main seasonal cycles: spring/summer (sample Sep-Nov, bulk Jan-Apr, ship Mar-Jun) and autumn/winter (sample Mar-May, bulk Jul-Oct, ship Sep-Dec). Capacity tightens 4-6 weeks ahead of Ramadan and Q4.

Key facts
SS buying window
Sep-Nov
AW buying window
Mar-May
Peak capacity stress
Pre-Ramadan, Q4
Sample to ship
12-16 weeks

The two main cycles

Spring/Summer collections start sampling September-November and ship March-June. Autumn/Winter samples March-May and ships September-December. Each cycle covers 12-16 weeks from approved tech pack to FOB.

Mid-season drops and replenishment programs run continuously, with 3-6 week cycles for stocked-fabric programs.

Capacity constraints

4-6 weeks before Ramadan (typically Feb-Mar), modest fashion ateliers run at 110-120% capacity. Booking ahead is essential for Ramadan deliveries.

Q4 (Oct-Dec) sees fast-fashion replenishment volume spike for European retailers. Reserve capacity 8 weeks ahead for Q4 delivery slots.

Trade fair calendar

January: ITPF Istanbul (premiere). February: Premier Vision Istanbul. March: IF Wedding Fashion Izmir, ISPO Munich. April: Texworld Paris. May: Istanbul Fashion Connection.

September: PV Istanbul return, Premier Vision Paris. October: Magic Las Vegas, ISPO China.

Sample order timing

For SS collection: send tech packs in August, get samples Sep-Oct, finalise designs Nov, place bulk Dec for Mar-Apr shipping.

For AW collection: send tech packs Feb, samples Mar-Apr, finalise May, bulk Jun-Jul for Sep-Oct shipping.

Ramadan and Eid impact

Many ateliers close 1-2 weeks during Ramadan in regions with high observant population (Fatih, Konya). Plan production windows around this calendar.

Eid al-Fitr and Eid al-Adha mean 5-10 day complete production pauses. Build buffer into all lead-time estimates around these dates.

Long-term capacity reservations

Major retailers reserve weekly capacity slots 12-18 months ahead at preferred factories. Smaller brands can negotiate quarterly capacity blocks for stable repeat programs.

Capacity reservations typically require 20-30% deposit on annual volume commitment. The trade-off is guaranteed slots and locked pricing.