Turkish lead times beat Asia by 2-4 weeks for European and Middle East buyers. Standard cotton jersey: 25-35 days door-to-door London. Knitwear with custom yarn: 45-60 days. Denim with washes: 40-55 days. This page breaks down every milestone from tech-pack approval to ex-works.

Frequently asked questions

How long does it take to produce 1,000 t-shirts in Turkey?

Standard cotton jersey tees: 21-28 production days after fabric arrival. Add 7-10 days for fabric, 5-7 for sampling, 3-5 for shipping to EU. Door-to-door London: 35-45 days from PO.

What is the fastest lead time achievable?

Merter ready-stock private-label can ship in 5-10 days. Custom cut-and-sew with stock fabric: 14-18 days for orders under 500 pieces. Full OEM with custom fabric: 45+ days minimum.

How does Turkey compare to Bangladesh on lead time?

Bangladesh ocean shipping adds 28-35 days to EU; Turkey overland truck is 4-6 days, air freight from IST 1-2 days. Net advantage: 25-40 days faster total cycle.

What delays are common in Turkish production?

Yarn dyeing for knitwear (5-10 day risk), accessory imports from China (zippers, labels), Eid and Republic Day holidays, and lab-dip approval cycles. Build a 7-day buffer into every PO.

Are lead times shorter for repeat orders?

Yes. Tooling, patterns, and fabric reservations are pre-set. Repeat runs of the same SKU typically ship 30-40% faster than first orders.